PROGRESS OF CONSTRUCTION OF THE OFFICE BUILDING (KOSTYOLNA ST., 13A)

Дата: 
26.03.09

Elevation finishing is nearing completion, the building has been plastered and painted with yellow masonry paint. The elevation color perfectly matches the color of the elevation of the Roman Catholic Church of St. Alexander located next to it. Interior decoration of premises is underway.

Превью: 
<p class="bodytext">Elevation finishing is nearing completion, the building has been plastered and painted with yellow masonry paint. The elevation color perfectly matches the color of the elevation of the Roman Catholic Church of St. Alexander located next to it. Interior</p>
Вес: 
40
All news

The Embassy of Canada has moved to the new office

November 2018

We are happy to inform all repair works have finished...??


Rearrangements

April 2013

At the moment there are rearrangements for new tenant – The Embassy of Canada....??


PROGRESS OF CONSTRUCTION AT KOSTYOLNA, 13А

29.04.11

Construction and assembly operations fully completed, the building is ready for occupation...??


PROGRESS OF CONSTRUCTION OF BUILDING, LOCATED AT KOSTELNAYA STR, 13

14.08.09

Works to accomplish the building entrance group have been practically completed. Front elevation of the building with entrance group Inside repair works have been completed, except for some trifles . Central stairs has been covered with tiles...??


CONSTRUCTION PROGRESS OF OFFICE BUILDING LOCATED AT 13A, KOSTELNAYA STR.

06.07.09

- the works for organization of entrance group are actively conducted: finishing with granite tile, the stairs is completed in concrete. - the railings of entrance group are made in classical style with decorative elements - columns, the top of which...??


REPAIR AND CONSTRUCTION ACTIVITIES IN KOSTYOLNA STREET ARE UNDERWAY

07.05.09

During construction work, we preserve old architectural elements of the building, such as stucco work along the entire perimeter of the building capping...??


THE INTERIOR WORKS ON KOSTELNAYA, 13A

23.04.09

April, 23 the interior works are in full speed : plasterboard walls were installed and painted, the suspending selling frame and conditioning system have been mounted...??


PROGRESS OF CONSTRUCTION OF THE OFFICE BUILDING (KOSTYOLNA ST., 13A)

26.03.09

Elevation finishing is nearing completion, the building has been plastered and painted with yellow masonry paint. The elevation color perfectly matches the color of the elevation of the Roman Catholic Church of St. Alexander located next to it. Interior...??


2009-2013 © PJSC ISA Prime Developments
Ukraine, 03680, Kyiv, N.Grinchenko st, 4 HORIZON PARK BUSINESS CENTER
phone: (044) 490-69-70, 490-69-64, 496-90-52; fax (044) 496-37-57
e-mail: svetlana@nhps.kiev.ua, reservation@nhps.kiev.uа