Erection of Building 1 is over, finishing operations were started, including laying marble and elevation tiles. The elevation will be finished in the classical style, in the spirit of the early 20th century, with special elevation tiles ordered for that purpose. The photograph below shows preparation of the building for elevation finishing. Installation of engineering networks is in progress, too.
In Building 2, installation of a monolithic ferroconcrete base slab is nearing completion, installation of pylons and arrangement of the entrance lobby are underway.