- the works for organization of entrance group are actively conducted: finishing with granite tile, the stairs is completed in concrete.
- the railings of entrance group are made in classical style with decorative elements - columns, the top of which is decorated by granite balls.
- hammered railings are installed in all balconies and in the veranda.
- inside the building the finishing works of central stairway are completed: the tile is installed, the railing has to be installed any day now.
- in the space behind the ceiling all necessary engineering communications are installed and the works for installation of the false ceiling plates have been begun.
- the elevator by “Otis” Company has been installed.
- on the ground and first floors the doors have been installed.
- water closets on all floors are already completed: the tile is laid, the sanitary ware has been installed and connected, the doors with locks have been installed.
- fire-fighting system is connected and is functioning, fire cocks are installed on each floor.
Links:
[1] http://nhps.com.ua/userfiles/49_1000.jpg
[2] http://nhps.com.ua/userfiles/51_1000.jpg
[3] http://nhps.com.ua/userfiles/53_1000.jpg
[4] http://nhps.com.ua/userfiles/67_1000.jpg
[5] http://nhps.com.ua/userfiles/68_1000.jpg
[6] http://nhps.com.ua/userfiles/54_1000.jpg
[7] http://nhps.com.ua/userfiles/56_1000.jpg
[8] http://nhps.com.ua/userfiles/58_1000.jpg
[9] http://nhps.com.ua/userfiles/60_1000.jpg
[10] http://nhps.com.ua/userfiles/61_1000.jpg
[11] http://nhps.com.ua/userfiles/62_1000.jpg
[12] http://nhps.com.ua/userfiles/66_1000.jpg